Nikke Wiki

Piling Project Report

Piling Project Report

An old report by a researcher.

Piling Project No. 14

In order to designate coordinates, we created a supporting disc that is placed on the ground. After conducting numerous tests, we adopted a flat design that is easy to carry and can adapt to various types of terrain. However, further research is necessary to embed a GPS feature.

Piling Project No. 21

We fired test piles three times at the coordinates where the disc was placed. All three tests failed due to operator errors. Three nearby researchers were injured as a result. Suggest incorporating an essential training course for operators.

Piling Project No. 30

Moved to surface for final testing. PBZ 188.83/Desert area - construction not possible. Reason: Material shortage and unit loss due to Rapture attack. SBV 85.1/Moved to a nutrient-rich forest for material procurement - construction halted. Reason: Material shortage. Note: Confirmed that organic materials alone are insufficient. Test temporarily suspended.

Piling Project No. 30-1

Moved back to surface to continue Test No. 30. NJK 2.00/Derelict city - construction successful/Materials abundant. Note: Reconstruction signal detected near the coordinates of PBZ 188.83 from Test No. 30. Awaiting confirmation. First phase of testing complete.

Ads by Google